Construction sector · Scope 1–3

Your construction company’s carbon footprint – from site to finished report

NEOGAGE brings together data on machinery and fleet fuel, energy at sites and depots, materials, transport and waste. It calculates Scope 1, 2 and 3 emissions and shows which sources contribute most.

Book a 30-minute demo

We’ll show you what data your company needs and where to start.

NEOGAGE Carbon Footprint emissions charts on a laptop and phone

A methodology your investor and auditor can use

  • GHG Protocol
  • ISO 14064
  • ISO 14067
  • EPD under EN 15804
  • Scope 1 · Scope 2 · Scope 3
  • TÜV NORD

From 2028, new buildings with more than 1,000 m² of useful floor area will disclose their whole-life carbon footprint in their energy performance certificates. From 2030, this will apply to all new buildings. (European Commission, EPBD)

Does this sound familiar?

Common reasons construction companies start calculating their carbon footprint.

  • The main contractor is asking for emissions data

    A questionnaire from the main contractor or investor arrived with the subcontract. The deadline is tight and you need to know where to start.

  • A tender, lender or building certification asks for a carbon footprint

    The contracting authority, lender or BREEAM/LEED assessment requires reliable figures instead of estimates.

  • Your data is scattered across sites and spreadsheets

    Fuel cards, site electricity bills, concrete and steel orders, and waste transfer records are all kept in separate project files.

  • You want to find your biggest sources of emissions

    Is it machinery, material deliveries, or concrete and steel? A single process makes it possible to compare contracts and years.

From scattered site data to one report

Before / Scattered data

  • Fuel cards
  • Machinery and equipment
  • Fleet
  • Site energy
  • Depots and offices
  • Concrete, steel, asphalt, aggregates
  • Material transport
  • Subcontractors
  • Construction waste
  • ERP
  • Excel

Each site manager sends data in a different format. Someone has to transcribe invoices, find emission factors and check for double counting. It starts all over again with the next questionnaire from the main contractor.

After / NEOGAGE

  • Site data
  • Calculations
  • Analysis
  • Report for the main contractor, investor or lender

Data goes into one system with built-in emission factors, and every figure can be traced to its source. Use the same data when it’s time for the next report.

How does NEOGAGE work?

  1. Collect data from sites and offices

    Bring together machinery and fleet fuel, energy at sites and depots, material purchases, transport, business travel and waste from every department and branch.

  2. Calculate Scope 1, 2 and 3 emissions

    Scope 1 covers fuel burned in machinery and vehicles. Scope 2 covers purchased electricity and heat. Scope 3 covers materials, transport, waste and the rest of the supply chain. Emission factors come from recognised databases including ecoinvent, KOBiZE, DEFRA, IPCC and EXIOBASE.

  3. Analyse emissions and report

    Identify the largest emission sources, compare periods and prepare reports under the GHG Protocol or ISO 14064 for a main contractor, investor, lender or your own ESG report.

See what your construction company’s carbon footprint looks like

NEOGAGE dashboard listing emissions categories

Dashboard

The whole company on one screen

View Scope 1, 2 and 3 emissions for the whole group or by company and business area.

Table with emissions data organised by scope

Data collection

Data from multiple sites in one place

Import data from different sources and contributors without copying files from site managers.

Doughnut chart showing the share of each emissions source

Emission source analysis

What really drives your emissions?

See whether equipment fuel, transport or materials contribute the most and where reductions can make the biggest difference.

Bar chart comparing emissions month by month

Results analysis

Year-on-year comparisons

Compare periods and emission categories to show investors how emissions are changing over time.

Preview of an emissions report in NEOGAGE

Reports

Reports ready for verification

Export reports under the GHG Protocol and ISO 14064. Building material manufacturers can also export ISO 14067 reports and EPDs under EN 15804.

See NEOGAGE in action for a construction company

In 30 minutes online, we’ll cover where to get site data and how to quickly prepare the report requested by your main contractor or investor.

How can we help?

You can select more than one option.

*By clicking the "Send" button you consent to the processing of personal data.

After submitting the form, you can choose a demo time.

Which site data will you need?

Download the construction checklist. In 15 minutes, see what data you already have and what you’re missing, so you can bring specific questions to the demo.

Checklist and demo preparation

  1. Data for calculating your carbon footprint

    Machinery and fleet fuel, energy bills for sites, depots and offices, quantities of materials purchased (concrete, steel, asphalt, aggregates), material transport and waste transfer records.

  2. What to prepare for the demo

    Who is asking for the data (main contractor, investor or lender), which period does it cover, and when is it due?

Download the construction checklist (PDF)